Pneumatic operated
Tartarini™ Type RP-10 Pneumatic-Loaded Pressure Reducing Regulators
46-2017
New product
Accessories
47-2017
New product
Accessories
48-2017
New product
49-2017
New product
Butterfly valves
50-2017
New product
2005.
Modifications and additions to the Performance Project of the Maksimir Stadium Gas Boiler Room
Main and performance project of the main water supply pipeline Aleja Bologna - Handcuff
2005.
Development of functional scheme and operating instructions for Maksimir Stadium
2005.
TECHNICAL DATA: Reconstruction of the existing waste pit Jaundice included: - Construction of a new reception concrete pit for liquid waste - Construction of a new pit for solid solid Waste - Reconstruction of the heating and pumping system the existing shipment of the pane - Design of the vehicle wash plateau with a catchment liquid waste pit - The solution of heating water for washing vehicles and pumps for that water - Pipelines connecting new pits with existing shafts Time je jama osposobljena za prihvat tekućeg otpada s područja Ivanić Grada i Žutica. The Main and Performance Project was built and the building was built.