Žutica

TECHNICAL DATA:
Reconstruction of the existing waste pit Jaundice included:

– Construction of a new reception concrete pit for
liquid waste

– Construction of a new pit for solid solid
Waste

– Reconstruction of the heating and pumping system
the existing shipment of the pane

– Design of the vehicle wash plateau with a catchment
liquid waste pit

– The solution of heating water for washing vehicles and pumps for
that water

– Pipelines connecting new pits with existing shafts

Time je jama osposobljena za prihvat tekućeg otpada s područja Ivanić Grada i Žutica. The Main and Performance Project was built and the building was built.