Žutica
TECHNICAL DATA:
Reconstruction of the existing waste pit Jaundice included:
– Construction of a new reception concrete pit for
liquid waste
– Construction of a new pit for solid solid
Waste
– Reconstruction of the heating and pumping system
the existing shipment of the pane
– Design of the vehicle wash plateau with a catchment
liquid waste pit
– The solution of heating water for washing vehicles and pumps for
that water
– Pipelines connecting new pits with existing shafts
Time je jama osposobljena za prihvat tekućeg otpada s područja Ivanić Grada i Žutica. The Main and Performance Project was built and the building was built.